Wednesday, April 30, 2014

East End & The Floinge River

Today's progress doesn't look like much. I  reprinted out tiles for all the settled areas and spent more time trimming the edges..I then spent a few hours "re-papering" Average & Owertown...
Average
Owertown

The paper was necessary because the spline and other styrofoam covers the original. I like being able to see where everything is going.

The scenery work continues. Spent time on East End finishing up on that side of Hollow Mountain. Built out the aisle side of the cut that leads into the tunnel (two track). I roughed in the scenery the rest of the way along that aisle. I was swinging west around to Carbon Point when I realized I didn't like how things looked.

At one time in the northeastern US railroads were literally tripping over each other. The anthracite lines in particular crowded into every river valley they could find. As a result you would often find several railroads running parallel in the same valley. I'm not talking "parallel routes" as Conrail os NS or CSX would see it. I mean parallel tracks. The most blatant case I can think of is the Lehigh Valley and CNJ running on the same side of the Lehigh Gorge. What appeared to be a four track mainline was actually two separate railroads...
Penn Haven
In other places the two railroads ran on opposite side of the river while a third line crossed over both on a high bridge. I believe there are several points were this occured. The Lehigh & New England and the Lehigh & Hudson River were constantly crossing the other two. In other places, like Aldeen and Catasauqua, four or more railroads would cross at grade over or under each other. In Philly, where I grew up, the PRR, Reading and B&O ran parallel in many places, including the area around 30th Street station. Then there's that famous shot of the tri-level crossing in Richmond, Va...
Two Over One

My point is that the average eastern railroad was not alone. Competitors were everywhere and many times too close for comfort. So I decided that it would not be too farfetched for my Average Eastern to run side by side with the competition. Hence the abandonement of the tunnels on the Class 1 tracks and this bit of scenic trickery...
Floinge River

I updated the plan after the fact having actually roughed in said waterway between Carbon Point and East End...
Floinge East End Bridge
Floinge Carbon Point Bridge








Not only do I get an excuse to run two railroads parallel, I get to make two more bridges.

I'm getting ready to work on the areas I've passed over so far. Alpha, Carbon Point, and the powerhouse/colliery are prepped and waiting to be roughed in.

I made some small changes to the plan that may add some other scenic interest. In Owertown, Milliard Fillmore Elementary is now a high school. This creates all kinds of possibilities as the youth of America explore their surroundings in small town America. Across the street from Milliard Fillmore High is a corner soda shop where the kids hang after school. Later on the crowd moves to Rockettes for more fun and frivolity. If things go as usual the conversation will turn to cars and eventually the gang will head over to Rt 442 in Quotidian. Mix teenagers with a half mile of straight asphalt and anything can happen,,,

Elementary School & Rt 442

High School & Straat Rd (Rt 442)
Those were the days!



Regards,
Frank Musick

Building a dream layout on a nightmare budget
The Average Eastern Railroad






Tuesday, April 29, 2014

The Bridges At Split River

Another eight hour day and more scenery roughed in. Most of it between Average and Owertown at what is now called Split River. There is an island in the center of the river so two bridges are required. A steel girder carries the AE over the west branch while a stone arch bridge crosses the east branch and the mudflats into Owertown...
Split River

The bridges are built from Atlas kits I've had for years, all of them recycled from the aborted Pennsy project. I'm guessing they could be better but right now they do the job.

The only thing I did that might be considered "special" was to stagger the deck joints on the arch bridge. This interlocks the spans and makes for a sturdier model. It won't be any stronger, just less prone to fall apart when I lift it out to paint and weather...
Staggered Joints
After the glue set on the arch assemblies I put it in place so I could get the proper height for the supports...
"Hanging" Bridge

I cut the supports to the proper height and glued them in place. While the glue set I went to work on the girder bridge. I had envisioned a curved bridge, but decided a straight bridge wold be better. Unfortunately, a big sweeping curve already exists in that area. I would have to realign the roadbed...
Realignment Necessary

With the stryrofoam spline this isn't as hard as it sounds. I just move the spline into it's new alignment. Once the roadbed lined up I used supports and abutments made from arch bridge parts and set the girder in place...
Girder Bridge

I installed the arch bridge back into place before roughing in more scenery...
Stone Arch Bridge

Installing the cardboard matrix for the terrain takes a while. Each strip is placed individually. I try to get the cardbord to lay naturally. I don't use stiff cardboard. I knead it with my hands to make it pliable. Thumbtacks and drywall screws hold it in place until the glue dries. To me the resulting framework looks like actual land forms. Once it's covered in the final shell it's pretty convincing...
Test Shell, Lake Elsinore

I rolled #11 out and staged a short AE freight crossing the Split River...

Crossing the Split River Into Owertown

Of course you have to take one of those low angle pictures...
#11 Pulls A Freight Over the Split River

It's funny, spending a full eight hours on your hobby is just as tiring as a real job. A lot more fun, but tiring.

Regards,
Frank Musick

Building a dream layout on a nightmare budget
The Average Eastern Railroad






Monday, April 28, 2014

Field Modifications

While doing a bit of organic design work on the layout scenery I came across some things I wanted to do another way. It's one thing to look at a scale drawing, it's quite another to work with the actual scenery. Case in point, Owertown. The town is huge, about twelve feet long and three feet across. It needed to be scaled back a bit...
Average Eastern April 28th, 2014


I dropped a block out of the middle and cut out a row of stores near city hall. The OTC trackage no longer runs down Railroad Avenue. That thorofare is gone leaving just Commerce and Market streets. Othir Street is gone and St Aloyisius ended up at the corner of Church and Market.

Wm H. Taylor & Co. has relocated from the east end of Quotidian. The plant is now across the tracks from Excelsior Machine in Owertown. Taylor & Co shares a spur with the OTC carbarn and powerhouse...
"New" Owertown

The two long tunnels on both Class 1 mainlines are now open. I had some sort of tunnels in mind with drop down panels for emergency access. Now I may just leave the trains visible. Spectators seem to like being able to actually see the trains even if it may not make sense from a protoypical point of view. Tunnel access in general is a concern so I daylighted the four track between Average and Quotidian. The scenery also affected the location of the Average depot. I moved it to the east end of town...
Daylighted
The river in that location ended up quite different from the original idea. The AE will now cross a wide "valley" on a bridge built from seven Atlas viaducts...
Split River

You can see the four track passing under the AE in the center of the picture. I plan to build another bridge at that location.

At Average Hollow Mountain is too close at hand and crowds the engine facilities. I wanted some intervening space so I consolidated...
Average "Reimagined"

Of course after all this work I had to play a bit. I staged some equipment at Average...
Average Yard and Engine Facilities
The Busy Pennsy Mainline


Still a great deal of work to do

Regards,
Frank Musick

Building a dream layout on a nightmare budget
The Average Eastern Railroad






Wednesday, April 23, 2014

More Progress

Didn't want to post until I had some substantial progress to show. I've been working on the cardboard "matrix" that supports the scenery. I've been able to rough in quite a bit of the layouts terrain...
Average
The "hills" at Average are a bit taller than I had envisioned, but the higher elevation was required by the addition of the separate two track loop. One unexpected result; the additional height creates a view block between Average and the rest of the layout. Makes it seem larger without having to resort to the backdrops I want to avoid.

More serendipity. I had to buy a 4' x 8' slab of 2" thick foam for a home project. Part of the leftovers found a home in Owertown...
Owertown
Some of the terrain I've been working on includes creeks and other water courses...
Ower Road Bridge Over Tacannee Creek

Another chunk of that slab went to Alpha where the Average Eastern crosses West Llanerch Creek...
West Llanerch Creek Bridge

East of Alpha the AE follows Iriquois Creek to Lake Elsinore...
Iriquois Creek and Lake Elsinore
The railroad runs along the shore of the lake and crosses East Llanerch Creek on a combination stone arch and steel girder bridge before entering Quotidian...
Girder Bridge Under Constructon

I pasted a new drawing in place on the Quotidian slab. Although I don't currently have the turnouts constructed I still laid track at various industries...
Quotidian

Just east of Quotidian the AE travels over and parallel to the four track tunnel...
Four Track Tunnel
Before reaching East End the little line passes Carbon Point and runs above the two track tunnel...
Carbon Point

Two Track Tunnel

I haven't done much work to East End, but I have been building up the mountain where the two mainlines cross. The empty inside suggested a natural name for it...
Hollow Mountain at Average

Making the two Class 1 mainlines generic gives me the opportunity to model a variety of railroads. My locomotive roster includes two bare DL109 mechanisms. I was able to buy a set of these ALCo shells off E-Bay...
DL109 Shells

The goal is to paint two of them for the New Haven and run them on the two track...
Future New Haven Units
I would like to use the other shells to create models of a very rare ALCo freight unit. In 1945 the company built an A-B-A set of  demonstrators. Although officially designated DL-202 (A unit) and DL-203 (B unit) the set got nicknamed "Black Maria" because of the rather somber paint scheme...
Black Maria
The locomotive was tested on the D&H, the New Haven and the Bangor & Aroostook. Before the tests were finished, ALCo introduced the FA. The FA went into production in 1946. The three demonstrators were scrapped in 1947.

That's all for now.

Regards,
Frank Musick

Building a dream layout on a nightmare budget
The Average Eastern Railroad






Wednesday, April 16, 2014

East End

More progress. Roadbed is complete except for the turntable at East End. Trackwork is progressing, but things have reached a point where turnouts will need to be created.

As mentioned before, the layout is "generic". Even though the Average Eastern is freelanced, it's the connecting roads where the term generic has the most latitude. Currently, the Pennsylvania Railroad interchanges with the AE at Average. The PRR is just one of several lines that had a four track main. It could be the New York Central, Erie, Lehigh Valley or Jersey Central.

At East End the options expand quite a bit. There are literally dozens of railroads with two track mains. Two tracks however can also be found on single track main stems with long sidings. I recently got a deal on some locomotives lettered for the Delaware, Lackawanna & Western. At the moment, the double track Class 1 that connects at East End is the DL&W...
East End
It's pretty busy at the moment. AE #11 is just arriving with a short freight. Off in the backgtound, the Company Shay is picking up a string of empty hoppers to run back to the mine. A Lackawanna Geep is working the interchange track as a pair of F units rolls west with a mixed freight.

The F units are currently lettered for the Erie Lackawanna, a merger that didn't take place until 1960. That's a bit late for the period the layout is set in. Fortunately the paint scheme on Lackawanna units is the same. The units can be backdated by replacing the nose herald and the side lettering.

I'm beginning to rough in some of the scenery. I started at East End. I'm using cardboard strips for the basic landforms. I tried to make a general shape and the randomness that appears in nature...
Rough Scenery East End


Carbon Point

I also started roughing in the general layout of Owertown. The roadbed for the Owertown Transit Co. is in place and ready for track...
Owertown: OTC Tracks

Quotidian needs a new full size drawing. I used the peninsula as a work area and the old one got pretty beat up. Once I have the drawing laid out I'll start on the track. 

Average is straing to take shape. The roadbed for the yard is all down and ready for track. I also got a start on the turntable pit and base for the Average enginehouse...
Average Enginehouse

I tried to keep the track well in from the edges of the benchwork this time. Lost a lot of equipment to the unyielding concrete floor.There are still some places where tracks run too close to the brink. On the aisle side of these areas I have constructed what I'll call berms. I used 1" thick extruded foam strips. They look like walls right now. The idea is to shape them so they look like steep banks or rock cuts...
Berms

I made some more electrical connections and got power to all tracks, including the Q Company. Unfortunately the MRC throttle I was going to use for the Q is damaged so the Shay wisn't running yet. Anyway, I fired the layout up and ran some trains...



Regards,
Frank Musick

Building a dream layout on a nightmare budget
The Average Eastern Railroad