Sketch: Track Plan |
For the most part I think the branch/short line will work. Looking over other track plans and such there doesn't seem to be any particular rule to how industrial sidings work. The industry is located here and they need a siding is the only priority. Trailing point turnouts are preferred but are not always possible. In some cases a switchback siding may be the only alternative so I threw one in at Common. The anthracite and/or autunite mine will be supplemented by "wildcat" loaders, a kind of team track for mom & pop mining operations. Still wondering how to work in a logging operartion or lumber mill.
One location I'm having trouble with is the former "Horseshoe Curve". I envision the mainline tunneling through a ridge line that is cut by the river. The branch crosses the mainline and the river twice. In between the river bridges the branch runs through a cut in the ridge...
Problem is that the branch is in the foreground and at a higher elevation. On most model railroads the exact opposite would be the case. I'm not sure how it will look. Once again I'll have to lay it out using real track in the space allotted.
Sketch: What To Do |
Problem is that the branch is in the foreground and at a higher elevation. On most model railroads the exact opposite would be the case. I'm not sure how it will look. Once again I'll have to lay it out using real track in the space allotted.
A much easier area to work on is the engine terminal and yard. The yard is small as befits a railroad the size of the Average Eastern. I tried to set up the sand, water and fuel in a logical flow coming out of the two stall enginehouse. The facilities sit between the tracks so two engines can be serviced at one time. Not sure how many small time roads would do this, but this is my railroad...
With the cold snap we've been having and other interruptions progress is slow, but sure.
Sketch: Average Facilities |
With the cold snap we've been having and other interruptions progress is slow, but sure.
An interesting aspect that has surfaced is the use of both DC and DCC on the layout. The mainlines are DC, controlled by two MRC twin packs. Since the "orbiting" trains run at constant speeds on their own track without human intervention that's all that's needed. The Average Eastern is DCC. Since one track is used by multiple trains it's imperative that each locomotive be controlled individually. I have the decoders and installation instructions for the Bachmann 2-8-0's on the roster. A Bachmann doodlebug will handle the passenger traffic.
That's all for now,